RPO 3' Driveway Quarter Pipe

next >  • index •  < previous Stud Spacing and Frame Assembly
Drawing and Cutting Transition Templates

Assembling the frame is easy! Remember the golden rule of transition framing: space studs at 8" on center, and double them up every 48". For the deck and coping, just refer to the diagram as shown. Attach each stud with four 3" exterior wood screws, two through each end. Refer to this diagram throughout the next few steps, it'll be located below the main photo!

tear

Jump to another Category