RPO 3' Driveway Quarter Pipe

next >  • index •  < previous Drawing and Cutting Transition Templates
Quarter Pipe

Mark the notch for the coping to rest in. Make a box that has a lower line measuring 5/8" from the deck, and a left edge measuring 1-1/4" from the transition. Refer to the diagram below.

Drawing and Cutting Transition Templates tear

Jump to another Category