RPO 3' Driveway Quarter Pipe

next >  • index •  < previous Drawing and Cutting Transition Templates
Quarter Pipe

Pin a screw into the stack of 1/2" plywood. Place the screw 2-1/2" from the right, and 6" from the top. Refer to the diagram below.

Drawing and Cutting Transition Templates tear

Jump to another Category